Switzerland

The first test of patience

For the first time we are put to the test a little

Actually, we would now like to enjoy the warm autumn sun of Italy. For the well-known reasons, however, we are still in Portalban and need warm clothes.

Time really passes quite quickly, perhaps even too quickly to realize our goal of spending the winter of 2001/02 in Tunisia.

Waiting for the navigation instruments sent to Raytheon in England is very nerve-wracking.

We are doing work that we actually intended as winter activities in Monastir. Here a shelf is installed, there a cover strip is fitted, the sun canopy frame is assembled, the fan is finally screwed down firmly, and so on.

First thoughts and discussions about what we will do if we have to spend another winter here in Switzerland arise. Questions of whether we should look for an apartment for December, January and February, whether we should also look for work for these 3 months, and whether we really need to dig out our well-packed and mothballed winter clothes from the garage in Beitenwil suddenly become a hot topic between Yvonne and me. 27 September Life on board, however, already brings the engagement with nature that we were looking for. Unfortunately a little wetter and colder than we had imagined and wished for. The rainy days of this miserably poor September in terms of weather are finally over. As soon as the sun shines, it gets pleasantly warm again and our life on board takes place mostly outside again.

28 September

The disadvantage of the beautiful, sunny autumn weather here in the Seeland region is unfortunately that you cannot see any of it until noon. Sometimes even the whole day long, and then it becomes very hard for us and we begin to suffer from "sunshine withdrawal symptoms".